Webthe substitute or alternative clause or appendix shall take precedence. Sub-base Sub-base shall be Type 1 to Clauses 801, 802, and 803. Material shall be non-frost susceptible if it is used within 450mm of designed final surface of a road or paved central reserve. Requirements for construction materials Material WebAppendix 6/8 for Class 5A material from all areas of cutting and from all areas to be covered by embankment or by other areas of fill. 10 Topsoil shall wherever practicable be used immediately after its stripping and if not shall be stored in stockpiles of heights not exceeding 2m or other heights stated in Appendix 6/8.
Specification for Road Works Series 700 - Road Pavements
WebAppendix 5/1: Drainage Requirements 1. Drawings and Schedules 1.1. The Contractor shall construct the works in accordance with the following: (i) the Specification for Highway Works (SHW) (ii) the Numbered Appendices to the SHW (iii) the Drainage Plans (iv) the Drainage Schedules (v) the Highway Construction Details (HCDs) WebThe MCHW is our standard suite of specification documents which are included within a construction contract and the Contractor is required to comply with its contents. It is used in the majority of cases when we employ a Contractor. The documents are currently published on the older part of the Standards for Highways website. how many calories in a small banana milkshake
NATIONAL HIGHWAY SECTOR SCHEMES FOR QUALITY MANAGEMENT IN HIGHWAY WORKS …
WebRevises the Notes for guidance to the SHW sample contract specific appendix 7/1 to permit the specification of surface dressing materials. History. Interim Advice Notes (IANs) are issued by the Highways Agency from time to time. They contain specific Guidance, ... WebM7 traffic management qualification added to Appendix G1 as a priority requirement. 7.2.8 – Updated to state that unregistered operatives shall be ... (SHW) as a mandatory requirement for suppliers contracted to the Highways England where the SHW is a contractual document. Separately the document may be called up in specific contracts as ... WebApr 8, 2016 · Volume 2 Notes for Guidance on the Specifications for Highway Works Series NG 600 Earthworks testing and, where the Contractor is responsible, the testing details should be given in Appendix 1/5 and cross-referenced in Appendix 6/1. 3 (11/03) Where the Overseeing Organisation is carrying out testing Appendix 1/1 should list the apparatus … how many calories in a small can of pringles